| Scope
of ServicesPre-construction Services: Provide pre-bid and pre-bond
services tailored to the needs of each District. Our involvement includes the development
of project time-lines along with the Architect and budgeting in preparation of a bond
referendum. This information is presented to the public in print form, or often at a
public forum, where residents discuss the project first-hand with the members of the
project team.
Pre-bid services include the review of contract
documents with the Architect of Record in an effort to present the most cohesive package
possible to fully protect the interests of the District.
Construction Schedule and Completion:
Development of construction schedules with Architect and contractor, with constant
awareness of conditions which may cause delays in the completion of the project.
Observations: Conduct on-site observations
of work in progress, materials and equipment, as a basis for determining conformance of
work, with the contract documents prepared by the Architect.
Liaison: Serve as the Owner's liaison
between the contractor and Architect and maintain a working relationship with the
contractor on behalf of the Owner.
Job Conferences: Attend and maintain
records of all conferences held at the job site.
Observe Tests: See that tests which are
required by the contract documents are actually conducted; observe, record and report to
the Architect all details relative to test procedures.
Records: Maintain at the job site orderly
files for all correspondence, shop drawings and samples as reviewed by the Architect of
record, reports of job conferences, reproductions of original contract documents, and
photographs. Keep a log book, recording hours on the job site, weather conditions, list of
visiting officials, and daily activities. Record names, addresses and telephone numbers of
all contractors and subcontractors.
Reports: Report, as required, to the Owner
about progress, specific problems and current status of on-going projects.
Contractor's Requisition for Payment:
Review with all parties, the requisitions for payment as submitted by the contractor, as
well as detailed tracking of project costs from initial budget estimates to direct
construction expenditures.
Punch List: Assist the Owner and the
Architect of record in finalizing a comprehensive punch list for job completion and
acceptance.
|